Subscribe
Datacenters

Blackstone buys 75% of 13 AWS data centers in a $5B sale-leaseback at a 7% cap rate

Tuesday, November 17, 2026 · 5 min read

Blackstone's new listed trust will own most of two AWS campuses totalling 647 MW, with Amazon leasing everything back for up to 32 years — a deal repricing the whole datacenter sector.

Blackstone buys 75% of 13 AWS data centers in a $5B sale-leaseback at a 7% cap rate

The News

Blackstone Digital Infrastructure Trust (ticker BXDC) announced on November 16 that it will buy a 75.1% majority stake in two joint ventures with Amazon Web Services, in a deal valuing the portfolio at about $5 billion. The ventures will own 13 newly built data center buildings — called powered shells — across two AWS campuses: nine in St. Joseph County, Indiana, and four in Madison County, Mississippi, with 647 megawatts of total power capacity.

AWS keeps the other 24.9% and leases back 100% of the buildings on a triple-net basis, meaning the tenant pays rent plus the buildings' taxes, insurance and maintenance. The lease runs 12 years at first, with two 10-year renewals stretching it to 32 years. Rent rises 2.75% a year, guaranteed by Amazon.com Inc., the parent company.

BXDC will put in about $1.9 billion in cash from its May listing, and the ventures will borrow about $2.5 billion in new loans secured only against the properties. The agreement was signed November 11 and closing is expected in the fourth quarter of 2026, with a $150 million fee if either side fails to close. It is BXDC's first investment since listing.

A 7% cap rate on Amazon-leased buildings is the number every datacenter landlord will now be measured against.

Why It Matters

The AI buildout needs an enormous amount of money, and this deal shows how it is being paid for. Amazon guided to about $220 billion of capital spending in 2026, and its free cash flow — cash left after paying for everything — is expected to stay negative through 2027. Selling buildings and renting them back lets it keep building without carrying the full cost itself. Meta has used the same template for Hyperion and El Paso.

For Blackstone's trust, the deal is a strong start. Its first investment is a portfolio of brand-new buildings, fully leased to one of the world's biggest companies, with rent that rises every year and is guaranteed by the parent. That is about as safe as a property investment gets, and chief executive Nick Pell told Bloomberg the deal creates a roadmap for more deals like it with hyperscalers or developers.

The risk sits with the existing listed landlords. A cap rate is how property investors value a building, and 7% is the price Blackstone just paid for Amazon-leased buildings. If Digital Realty and Equinix are worth less at that rate than their shares suggest, their stocks could be repriced. That is why the deal is mixed: a win for buyer and seller, and a warning for everyone else.

Analyst's Take

Our call is Mixed. The deal is genuinely good news for Blackstone's trust and for Amazon's cash position: BXDC gets a huge, fully leased first investment with rent guaranteed by Amazon, and Amazon frees up cash in a year it is spending about $220 billion on AI infrastructure. But the 7% cap rate is the number that matters for the sector, and it cuts the other way for the listed landlords.

Short seller Jim Chanos noted that a 7% cap rate would value Digital Realty and Equinix materially lower than where they trade today — Digital Realty sits at about 22.8 times its forward AFFO, a measure of a property company's cash earnings. If the market values their buildings at Blackstone's price, their shares have room to fall. BXDC sees hyperscaler-leased datacenters as a $1 trillion market by 2030.

For readers, the lesson is that the funding of the AI buildout is shifting. With free cash flow expected to stay negative through 2027, Amazon is selling buildings and renting them back rather than owning everything outright. That keeps the buildout going, but the landlords' valuations now have a public price tag attached. Reader poll: Bullish or bearish on datacenter landlords? Vote: Bullish on BXDC, Bearish on DLR/EQIX, Mixed.

Are you bullish or bearish on this story?

By The Numbers

$5BPortfolio value
7.0%Initial cap rate
647 MWIT power, 13 buildings
32 yearsLease, both renewals
$1.9BBXDC cash, May IPO
$2.5BNew venture debt

FAQ

What is a sale-leaseback?

It is when a company sells a building it owns and leases it straight back. The seller gets a lump of cash now and keeps using the building, while the buyer gets a long-term tenant paying rent.

What is a cap rate?

A cap rate is the yearly rent a property earns, divided by its price. At 7%, the buildings are expected to earn about 7 cents a year for every dollar they are valued at. A higher cap rate usually means a lower price.

Is the deal done yet?

No. The agreement was signed November 11, but closing is expected in the fourth quarter of 2026 and still depends on conditions being met. Either side can walk away if the deal has not closed by December 31, 2026, unless that date is extended. The $150 million fee is different: it is the sole remedy owed by a party that fails to close when it is required to, not a price for walking away.

👁

Source: Blackstone

Get the daily briefing. AI news with a markets lens — tickers, bullish/bearish reads, zero hype. Subscribe free on Substack

More from AI Agent Update